WebAug 17, 2024 · The bar bending schedule gives the details to quantity surveyor for finding out the number of steel its type, size and shape. Contractor are using bar bending schedule (BBS) for ordering the steel bar for proceeding the construction. Steel fixer using bar bending schedule (BBS) for doing their work or installing the bar in column, beam or slab ... WebAug 12, 2024 · Now Calculate Cutting Length Of Column Cutting Length = (Footing Depth-Cover – M Bar – D Bar) + L Length + UG + No of Beam + No of Floor + Parapet + …
How to Calculate Slab Steel Quantity from Drawing BBS of Slab
WebThe following details are obtained from the figure-2: Length of Footing = X = 2m. Breadth of Footing = Y = 1.6m. Height of the footing (Thickness) = h =0.3m. Diameter of the Main reinforcement bars = d m = 12mm. Diameter of Distribution Reinforcement Bars = d d =12mm. Spacing of Main reinforcement bars = s m = 150mm c/c. WebAug 15, 2024 · Steps to calculate the Reinforcement required for Slab: Deduct the cover for finding length of bar. Evaluate the length of the distribution bar. Calculate the Value of ‘D’ (Depth of slab- Top cover- Bottom cover) Find out the No. of Bars. Compute the Total wt of steel required for slab reinforcement. canon mx925 software windows 11
How to Show and Hide Row and Column Headers in Excel
WebMar 30, 2024 · Whether you are a designer, detailer, contractor, or a manufacturer/supplier this spreadsheet will help you save a lot of time when preparing bar lists and when sorting, optimizing, tagging, etc rebar. In this package, you will get the following spreadsheets (BBS+Cutting Lenght) Bar Bending Schedule for Slab. BBS for Box Culvert. WebStep 2 – Find Lap Length of Column Reinforcement. As you know the steel comes at a predetermined length of 12.25 m or 40 feet. From the above calculations, we know that we have to lap the column at least once in order to attain the height. Assuming, Lap Length of column reinforcement as 40d. Lap Length = 40d = 40*16 = 640 mm or 0.64m WebOct 30, 2024 · The bar bending schedule calculation (BBS in Excel) is the most important part of steel calculation. Bar Bending Schedule is a list of bar according to the drawing of … canon mx925 fehler 6000